Div. B › Part 8 › 8.4 › 8.4.2 — Design and Construction Requirements

8.4.2.2 — Maximum Sewage Flow

Copied!
(1) A Class 2 sewage system shall not be constructed where the daily design greywater flow to the system exceeds 1 000 L/day.
Disclaimer. This site provides general access to Ontario Building Code information for reference only. It is not an official source and may omit or summarize content. Always verify requirements with the current OBC and your Authority Having Jurisdiction (AHJ). The Ontario Building Code is Crown copyright © King’s Printer for Ontario. Terms of Use.