Div. B › Part 4 › 4.2 › 4.2.5 — Excavations

4.2.5.8 — Backfilling

Copied!
(1) Where an excavation is backfilled, the backfill shall be placed so as to,
(a) provide lateral support to the soil adjacent to the excavation, and
(b) prevent detrimental movements.
(2) The material used as backfill or fill supporting a footing, foundation or a floor on grade shall be of a type that is not subject to detrimental volume change with changes in moisture content and temperature.
Disclaimer. This site provides general access to Ontario Building Code information for reference only. It is not an official source and may omit or summarize content. Always verify requirements with the current OBC and your Authority Having Jurisdiction (AHJ). The Ontario Building Code is Crown copyright © King’s Printer for Ontario. Terms of Use.