(1) Where an air test is made, it shall be conducted in accordance with the manufacturer’s instructions for the piping materials, and,
(a) air shall be forced into the system until a gauge pressure of 35 kPa is created, and
(b) this pressure shall be maintained for at least 15 min without a drop in pressure.