Div. B › Part 3 › 3.2 › 3.2.2 — Building Size and Construction Relative to Occupancy

3.2.2.31 — Group A, Division 3, up to 2 Storeys, Sprinklered

Copied!
(1) A building classified as Group A, Division 3 is permitted to conform to Sentence (2) provided,
(a) except as permitted by Sentence 3.2.2.7. (1), the building shall be sprinklered,
(b) it is not more than 2 storeys in building height, and
(c) it has a building area not more than,
(i) 12 000 m2 if 1 storey in building height, or
(ii) 6 000 m2 if 2 storeys in building height.
(2) Except as permitted by Clause (c) and Article 3.2.2.16., the building referred to in Sentence (1) shall be of noncombustible construction, and,
(a) floor assemblies shall be fire separations with a fire-resistance rating not less than 1 h,
(b) mezzanines shall have a fire-resistance rating not less than 1 h, and
(c) loadbearing walls, columns and arches shall have a fire-resistance rating not less than that required for the supported assembly, except that arches are permitted to be of heavy timber construction.
Disclaimer. This site provides general access to Ontario Building Code information for reference only. It is not an official source and may omit or summarize content. Always verify requirements with the current OBC and your Authority Having Jurisdiction (AHJ). The Ontario Building Code is Crown copyright © King’s Printer for Ontario. Terms of Use.