Div. B › Part 9 › 9.20 › 9.20.13 — Control of Rain Water Penetration

9.20.13.1 — Materials for Flashing

Copied!
(1) Materials used for flashing shall conform to Table 9.20.13.1.
(2) Aluminum flashing in contact with masonry or concrete shall be effectively coated or separated from the masonry or concrete by an impervious membrane.
Tables & Figures referenced
Table 9.20.13.1 : Flashing Materials : Forming Part of Sentence 9.20.13.1.(1)
Loading Table 9.20.13.1…
Disclaimer. This site provides general access to Ontario Building Code information for reference only. It is not an official source and may omit or summarize content. Always verify requirements with the current OBC and your Authority Having Jurisdiction (AHJ). The Ontario Building Code is Crown copyright © King’s Printer for Ontario. Terms of Use.