Div. B › Part 9 › 9.23 › 9.23.7 — Sill Plates

9.23.7.2 — Levelling of Sill Plates

Copied!
(1) Sill plates shall be,
(a) levelled by setting them on a full bed of mortar, or
(b) laid directly on the foundation where the top of the foundation is level.
(2) The joint between the sill plate for exterior walls and the foundation shall be sealed in accordance with Subsection 9.25.3.
Disclaimer. This site provides general access to Ontario Building Code information for reference only. It is not an official source and may omit or summarize content. Always verify requirements with the current OBC and your Authority Having Jurisdiction (AHJ). The Ontario Building Code is Crown copyright © King’s Printer for Ontario. Terms of Use.