Div. B › Part 9 › 9.26 › 9.26.5 — Eave Protection for Shingles and Shakes

9.26.5.2 — Materials

Copied!
(1) Eave protection shall be laid beneath the starter strip and shall consist of,
(a) No. 15 asphalt-saturated felt laid in two plies lapped 480 mm and cemented together with lap cement,
(b) Type M or S roll roofing laid with not less than 100 mm head and end laps cemented together with lap cement,
(c) glass fibre or polyester fibre coated base sheets, or
(d) self-sealing composite membranes consisting of modified bituminous coated material.
Disclaimer. This site provides general access to Ontario Building Code information for reference only. It is not an official source and may omit or summarize content. Always verify requirements with the current OBC and your Authority Having Jurisdiction (AHJ). The Ontario Building Code is Crown copyright © King’s Printer for Ontario. Terms of Use.