9.3.1.7 — Concrete Mixes

Copied!
(1) For pre-mixed concrete and for the site-batched concrete mixes described in Table 9.3.1.7., the maximum ratio of water to cementing materials measured by weight shall not exceed,
(a) 0.45 for garage floors, carport floors and all exterior flatwork,
(b) 0.65 for interior floors other than those for garages and carports, and
(c) 0.70 for all other applications.
(2) The size of aggregate in unreinforced site-batched concrete mixes referred to in Sentence (1) shall not exceed,
(a) 1/5 the distance between the sides of vertical forms, or
(b) 1/3 the thickness of flatwork.
Tables & Figures referenced
Table 9.3.1.7 : Site-Batched Concrete Mixes : Forming Part of Sentence 9.3.1.7.(1)
Loading Table 9.3.1.7…
Disclaimer. This site provides general access to Ontario Building Code information for reference only. It is not an official source and may omit or summarize content. Always verify requirements with the current OBC and your Authority Having Jurisdiction (AHJ). The Ontario Building Code is Crown copyright © King’s Printer for Ontario. Terms of Use.