Div. B › Part 9 › 9.3 › 9.3.1 — Concrete

9.3.1.9 — Cold Weather Requirements

Copied!
(1) When the air temperature is below 5°C , concrete shall be,
(a) kept at a temperature of not less than 10°C or more than 25°C while being mixed and placed, and
(b) maintained at a temperature of not less than 10°C for 72 h after placing.
(2) No frozen material or ice shall be used in concrete described in Sentence (1).
Disclaimer. This site provides general access to Ontario Building Code information for reference only. It is not an official source and may omit or summarize content. Always verify requirements with the current OBC and your Authority Having Jurisdiction (AHJ). The Ontario Building Code is Crown copyright © King’s Printer for Ontario. Terms of Use.