Div. B › Part 9 › 9.26 › 9.26.11 — Built-Up Roofs

9.26.11.6 — Number of Layers

Copied!
(1) Built-up roofing shall consist of at least three mopped-down layers of roofing felt flood coated with bitumen.
Disclaimer. This site provides general access to Ontario Building Code information for reference only. It is not an official source and may omit or summarize content. Always verify requirements with the current OBC and your Authority Having Jurisdiction (AHJ). The Ontario Building Code is Crown copyright © King’s Printer for Ontario. Terms of Use.