Div. B › Part 9 › 9.33 › 9.33.1 — General

9.33.1.1 — Design and Installation Requirements

Copied!
(1) The design and installation of central heating systems, including requirements for combustion air, shall conform to Part 6 and this Section.
(2) The design and installation of air-conditioning systems shall conform to Part 6.
(3) Repairs or component replacements that change the capacity or extent of safety of an existing heating, ventilating or air-conditioning system and that alter the method of operation shall conform to this Code.
Disclaimer. This site provides general access to Ontario Building Code information for reference only. It is not an official source and may omit or summarize content. Always verify requirements with the current OBC and your Authority Having Jurisdiction (AHJ). The Ontario Building Code is Crown copyright © King’s Printer for Ontario. Terms of Use.