Div. B › Part 9 › 9.20 › 9.20.14 — Protection During Work

9.20.14.1 — Laying Temperature of Mortar and Masonry

Copied!
(1) Mortar and masonry shall be maintained at a temperature not below 5°C during installation and for not less than 48 h after installation.
(2) No frozen material shall be used in the mortar mix.
Disclaimer. This site provides general access to Ontario Building Code information for reference only. It is not an official source and may omit or summarize content. Always verify requirements with the current OBC and your Authority Having Jurisdiction (AHJ). The Ontario Building Code is Crown copyright © King’s Printer for Ontario. Terms of Use.